GTM intelligence for industrial manufacturing

Turn manufacturing signals into prioritized pipeline.Built for the industrial economy.

Start with plants, capacity and expansion signals. TensorGTM maps sites to companies, scores fit and activates priority accounts in your CRM.

See how it works
One cold lead, brief → CRMSTEP 1 OF 7
  1. ● DEF
  2. ○ MAP
  3. ○ SIZ
  4. ○ SCO
  5. ○ PRI
  6. ○ ACT
  7. ○ OPR
MFG-4417Permit filed — chemical plant, cooling tower expansionDEFINE
  • ●Brief loaded — signals configured
  • ○Site matched to legal entity
  • ○TAM sized by segment & region
  • ○Scored — fit, lookalike & win
  • ○Backtested — priority tier set
  • ○Play launched — sequence on
  • ○Synced to CRM — monitoring on

Coverage across eight industrial markets

Manufacturing first. Eight markets covered.

One workflow spans the industrial economy. Each market gets its own registries, site signals and buying triggers.

01 / Chemicals & Petrochemicals

Plants, capacity and turnaround cycles

Track expansions, debottlenecking and turnaround windows, with utilities and cooling load attached.

  • Capacity, permit and EIA filings
  • Feedstock, utility and cooling load
  • Process, plant and procurement contacts

02 / Metals & Mining

Assets, throughput and expansion plans

Follow mine, mill and refinery programs from permitting to ramp-up, with power and logistics context.

  • Tenure, permits and throughput filings
  • Power draw, haulage and logistics
  • Operations, maintenance and procurement

03 / Cement, Glass & Building Materials

Kilns, lines and capacity adds

Spot new lines, capacity expansions and fuel conversions early, sized by plant scale and regional demand.

  • New line and capacity-expansion filings
  • Kiln and line scale, fuel conversions
  • Plant ops, capex and logistics buyers

04 / Oil, Gas & Power

Assets, projects and outage windows

Track pipeline, terminal and generation projects; time outreach to turnarounds and shutdowns.

  • Pipeline, terminal and generation filings
  • Capacity, outage and turnaround timing
  • Engineering, reliability and procurement

05 / Food, Beverage & Agri-Processing

Lines, cold chain and seasonal capacity

Map processing capacity, cold storage and line additions, with utility load and seasonal peaks in the record.

  • Plant, cold storage and line permits
  • Processing scale, utility and cold load
  • Plant manager, quality and procurement

06 / Discrete Manufacturing

Plants, lines and capex cycles

Track greenfield builds, line retrofits, tooling spend and supplier switches across discrete plants.

  • Construction permits and plant expansions
  • Automation and equipment capex disclosures
  • Plant manager, ops and procurement contacts

07 / Data Centers

Campuses, power and phased builds

Track hyperscale and colocation builds from land assembly to commissioning, with power and cooling context.

  • Land acquisition and utility interconnect filings
  • Megawatt capacity by campus and phase
  • Operator, GC and critical-systems contacts

08 / Real Estate

Land, approvals and phased delivery

Trace projects from land assembly and approvals to handover, so outreach lands in the buying window, not after it.

  • Land parcels, approvals and registration filings
  • Built-up area, phase and handover timing
  • Developer, project and procurement teams

09 / Not on the list

Tell us your sector

Every market we don't cover yet is a new industry layer to map. Tell us the vertical and we'll show you what its signals look like.

Scroll or hover an edge to glide →

The TensorGTM workflow

Ten stages. One connected revenue system.

  1. 01

    Define

    Client Brief

    Capture the offer, buyer, demand signals and customer evidence.

    Output

    Industry brief, signal framework and client dataset

    What adapts

    Buyer profiles, triggers and win/loss data.

  2. 02

    Map

    Lead Enrichment

    Build the company and site universe from industrial sources.

    Output

    Company and site master list

    What adapts

    Registries, permits and trade data.

  3. 03

    Map

    Site to Company Matching

    Connect each facility to its operator, parent and buyers.

    Output

    Site, entity and contact links with confidence

    What adapts

    Ownership sources and site naming.

  4. 04

    Map

    Geo-Spatial Enrichment

    Read imagery for assets, scale and site activity.

    Output

    Site-level signal fields with confidence scores

    What adapts

    Industry assets and available imagery.

  5. 05

    Size

    TAM Scoring

    Size segments by facility count and likely spend.

    Output

    TAM by segment and region, with go / no-go guidance

    What adapts

    Site spend, asset count and capacity.

  6. 06

    Score

    Lookalike Scoring

    Rank sites by similarity to your best customers.

    Output

    Similarity score per site

    What adapts

    Asset mix, scale, process and region.

  7. 07

    Score

    Ability to Win

    Score account fit, access, competition and timing.

    Output

    Win score per account

    What adapts

    Service reach and buying cycles.

  8. 08

    Prioritise

    Backtest and Priority Tier

    Validate the ranking, then assign priority tiers.

    Output

    Validated priority tiers

    What adapts

    Weights, cut-offs and accuracy targets.

  9. 09

    Activate

    Inbound and Outbound Design

    Turn priority tiers into messages and channel plays.

    Output

    Playbooks and sequences

    What adapts

    Personas, hooks and buying triggers.

  10. 10

    Operate

    CRM Integration and Monitoring

    Sync accounts and signals, then learn from outcomes.

    Output

    Live CRM records, change alerts and retrained scores

    What adapts

    CRM fields, routing and alerts.

Scroll or hover an edge to glide →

Geospatial signal channels

Industrial intent lives on a map, not in a web form.

A new substation, a rezoned parcel, an amended permit — earlier, harder signals than any content download. TensorGTM ties each event to coordinates, resolves it to an account and hands your team a reason to call today.

Manufacturing location Identification
Facilities pinpointed from satellite imagery
Cooling tower detection
Cell count, type and new installations
Water bodies proximity
Distance to rivers, lakes and reservoirs
Plant size calculation
Footprint measured in sq ft from imagery
Power infrastructure
Substations, transmission lines, MW capacity
Expansion & change
New construction and site growth over time
Site scan · MFG-4417 live
25.6866°N 100.3161°W · Monterrey, MX

Coordinates locked

25.6866° N, 100.3161° W

99% · Geocoder · permit address

Signal 1 of 7 · Coordinates locked

Works with your stack

  • Salesforce logo
  • Zoho logo
  • HubSpot logo
  • LinkedIn logo
IDENTIFY
Find facilities from site-level market signals
ENRICH
Turn locations into usable account context
PRIORITIZE
Focus teams on accounts showing intent
ROUTE
Move qualified accounts into GTM workflows

From brief to pipeline

Bring us a territory. We'll bring the signals.

Name a sector and a region. We'll map the facilities, score them against your brief and show you the accounts worth working first — before they reach your CRM.